Thursday, February 6, 2014
Tuesday, February 4, 2014
ColoradoWater: High Altitude Flow Structures, Wintertime Streamflow Diversion Optimization and Flow Monitoring
5-Weir Diversion Structure (Flow Optimization and Measurement) |
Diversion Pond and Pump House (Summer) |
Real-Time Data Acquisition (water levels, flow rates, bypass requirement) |
Diversion Structure Covered and Heated in Winter |
Monthly Bypass Requirements |
Diversion Pond (Winter) |
Original V-Notch Weir in Culvert |
Subscribe to:
Posts (Atom)