Thursday, February 6, 2014
Tuesday, February 4, 2014
ColoradoWater: High Altitude Flow Structures, Wintertime Streamflow Diversion Optimization and Flow Monitoring
![]() |
| 5-Weir Diversion Structure (Flow Optimization and Measurement) |
Diversion Pond and Pump House (Summer) |
| Real-Time Data Acquisition (water levels, flow rates, bypass requirement) |
| Diversion Structure Covered and Heated in Winter |
| Monthly Bypass Requirements |
| Diversion Pond (Winter) |
![]() |
| Original V-Notch Weir in Culvert |
Subscribe to:
Comments (Atom)

